Waste incineration

Where waste becomes energy –
and emissions remain under control

Thermal waste recycling places high demands on technology and materials. Aggressive gases, extreme temperatures and strict emission limits require robust systems – and well thought-out concepts. Kraps has been supplying just that for decades: heat exchangers, cooling systems and components that recover energy, reduce emissions and make operation safe and efficient.

Whether for flue gas cooling or the use of waste heat in other processes – we think ahead, plan ahead and deliver solutions that last.

In waste incineration, every component determines whether the plant runs efficiently, with low emissions and economically. Operators need systems that work predictably, last a long time and can be replaced or adapted quickly in an emergency.

This is exactly what Kraps stands for.

  • Plannable downtimes thanks to robust technology
  • Maximum service life under extreme conditions
  • Short response times for replacements or conversions
  • High level of integration for customized solutions
  • Technical understanding down to the last detail

Our heat exchangers and appliances are made for continuous operation in the most demanding environments – robust, easy to maintain and designed for predictable cycles. Through precise material selection and high-quality manufacturing, we ensure maximum service life, even with corrosive gases, fine dust and temperature fluctuations.

Thanks to our own design and production facilities, we can react flexibly – even in the event of special requirements or short-term replacement needs. We do not supply standard products, but solutions tailored precisely to your installation situation and operating conditions.

And because we understand exactly what happens in your system, we think beyond the component – we deliver technology with vision.

Secure reliable technology for your plant – talk to us about heat exchangers for your waste incineration plant.

One of our experts will be happy to advise you without obligation in an initial consultation.

We will call you back:

"*" indicates required fields


Please prove you are human by selecting the heart.
This field is for validation purposes and should be left unchanged.

Do you have any questions or would you like to discuss a project?

Our team looks forward to hearing from you!

"*" indicates required fields


Please prove you are human by selecting the house.
This field is for validation purposes and should be left unchanged.